Enclosure Field Verification Form

Tungsten Royce · Custom Wood Products

Form #

Responsibility assignmentsoptional

Set who is responsible for each task, or apply a preset. This drives the color-coded role on every task below.

#TaskResponsible party
Manufacturer Rep Contractor Homeowner Alternate Primary Architect Salesman Installer Design Engineer Office / Books
0 of 8 complete
1

Minimum WIDTH laser measurement of current enclosure

Minimum clear width of the existing opening (laser), jamb-to-jamb.

2

Minimum HEIGHT laser measurement of current enclosure

Minimum clear height of the existing opening (laser), sill/threshold to head.

3

Discrepancies outside normal

Flag if the opening is out of square / out of tolerance, then mark the affected jamb(s).

Affected jamb(s) — check all that apply & note the deviation
4

I am applying Cladding to the outside face of the supplied door/s

If yes, document the cladding material and how it is applied.

Adding cladding on the TR-supplied door?
Cladding details
inches
inches
5

Special requests

Any special instructions, custom conditions, or notes for this opening.

6

Paint / stain color selection (where it applies)

Final paint or stain for the supplied doors — name, code & sheen. Skip if doors ship unfinished. Physical samples available on request — prepared and sent by our team.

7

Hardware finish selection (where it applies)

Handle / hinge / exposed hardware finish for manual doors and pedestrian doors.

8

Seal package confirmation for installation

Door seals, brushes, Q-lon, astragal bulb — the package for this opening, confirmed before crating.

Summary

0 / 8
Tasks completed
8
Items outstanding
0
Jamb discrepancies flagged
No discrepancies flagged.

Tip: “Save data” downloads a small file you can re-open later with “Load data” to continue where you left off. “Print / Save as PDF” makes a clean copy for the job file.